PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued installing the elevator guide rails at Elev. 1,2,3 Facing West.jpg Installing the Sprinkler System at the Sprinkler Room Facing East.jpg Laying out block at the 1st floor Facing South.jpg Started wiring the VAV boxes at the 3rd floor Facing South (2).jpg Started wiring the VAV boxes at the 3rd floor Facing South.jpg Started closing up the walls at the lower roof Facing West.jpg Prepping the slab on grade at the Boiler-Electrical Room Facing North-East.jpg